Designed BGRIMM Group, DR Congo PE527 Lease Lukuni 30kt/a EW Copper Project was successfully put into operation recentlyand produced qualified cathode copper on Oct. 27th, 2019. As a comprehensive mining, processing & metallurgyproject, thehigh-qualityengineering and high-efficiency designprovided by BGRIMM Group receivedhighrecognition fromboth theclient andlocalauthority,andtheproject currently realizes continuous production.
The successful launch and production of the Project, further consolidatesBGRIMMGroup’sleading role in DR Congo’s non-ferrous mine market. Lukuni Project is one of the other engineering landmarks of BGRIMMGroupin DR Congo,serving as another memorial milestone of BGRIMM Group on the land of Africa.